Case Study

Bodyscapes Locker Rooms

Bodyscapes is a fitness center in the Longwood Medical Area. Their shower areas were cramped and starting to show their years, so Bodyscapes hired Construction Coordinators, Inc. (CCI) to perform renovations on them.

Bodyscapes remained open during construction, so the question soon arose of how to perform renovations while preserving the privacy of the changing areas. The showers were located at the back of the locker rooms, so any construction workers would have to travel through the entire changing area to perform any work. To solve this issue, CCI built a wall separating the changing areas from the shower area, so that it was completely isolated. This wall was a difficult installation, because privacy considerations require walls around locker rooms to reach all the way up to the underside of the floor above, and not merely end at the ceiling. After building the temporary wall, the locker rooms were separated from the work area, so CCI tunneled a hole through the non-loadbearing wall separating the two shower areas, to allow personnel, material and equipment to be transported through the men’s locker room, through the hole in the wall, and into the women’s shower area. Despite the difficulty of having to move all materials, equipment and personnel through a hole in the wall, CCI successfully renovated the showers to look brand new and to allow for more space.

Bodyscapes has been a high-quality fitness center for years, but now they are even better equipped to help people stay healthy and in shape—with a little help from CCI’s ingenuity.

Case Studies

  • Sheraton Needham

    The Sheraton Needham, located in a comfortable and convenient suburban Boston location, serves thousands of Boston-bound travelers a year.

    View Full Case Study
  • The Striar JCC

    The Striar JCC, located in Stoughton, faced a problem that many clubs would be happy to have: they were too popular.

    View Full Case Study
  • Renaissance Golf Clubhouse

    The Renaissance Golf Course Clubhouse is elegant in every sense of the word.

    View Full Case Study
  • Avery Dennison

    Avery Dennison, a Fortune 500 manufacturing company, was looking for renovations to their regional corporate headquarters in Framingham, including new offices, a cafeteria, and a training facility.

    View Full Case Study
  • Harvard Dental Center

    The Harvard Dental Center, a dental clinic attached to the Harvard School of Dental Medicine that provides service to the surrounding community, turned to Construction Coordinators, Inc.

    View Full Case Study
  • Harvard Aesculapian Club

    The Harvard Aesculapian Club, a social club associated with Harvard Medical School, was founded in 1902.

    View Full Case Study
  • Granada Highlands

    Granada Highlands is a high-rise residential complex in Malden.

    View Full Case Study
  • Bodyscapes Locker Rooms

    Bodyscapes is a fitness center in the Longwood Medical Area. Their shower areas were cramped and starting to show their years, so Bodyscapes hired Construction Coordinators, Inc.

    View Full Case Study
  • Bodyscape Fitness Area

    Bodyscapes is a fitness center located in the Longwood Medical Area, nestled among a wide variety of medical facilities and research centers.

    View Full Case Study
  • The Institute for the Bio-Cultural Study of Religion

    The Institute for the Bio-Cultural Study of Religion, or the IBCSR, is a non-profit research center focused on investigating the link between biology, culture, and religion.

    View Full Case Study

Working with CCI is like having our own construction department; but more responsive and experienced."

Paul Brandes, Principal, Charter Realty

Whenever we asked them for ridiculous things, we got them. CCI understood what it took to successfully complete the project."

Ed Pletman, Executive Director, Striar JCC

Tough jobs don’t scare these guys and that’s exactly what we needed to renovate the public areas in our Boston high-rises."

Ted Morton, Vice President, Equity Residential Properties

The most important challenge is that we didn’t harm our business; this wasn’t just a few new fixtures this was top to bottom."

Steve Lambert, General Manager, Newton Sheraton

CCI was flexible, easy to work with entirely responsive. We got what we asked for – and then some."

David Southworth, President & CEO, Willowbend Development LLC

We had a very fast track project, with changes arising daily. CCI wasn’t fazed by us and stayed on top of the details."

Gregg Ribatt, Bennett Footwear Group

CCI’s people are not only top-notch constructors but also are skilled at meeting with my tenants, listening to their concerns, and finding solutions."

Don Earl Stedham, Vice President, Investments/Project Management, Regency Centers

CCI met and, indeed, exceeded my expectations of performance. What was built was what we envisioned, greeting everyone with visual suggestions of who we are."

Jeff Grady, Chief Operating and Financial Officer, Rounder Records

CCI had a complete "can-do' attitude and made things happen. We couldn't have done it without you."

Janet Stegman, President, Stegman + Associates

When you find someone with enough experience to anticipate the problems that you are going to have, you want their help."

Leslie Saul, Founder and Principal, Leslie Saul + Associates

You bring intelligence, experience, and, most importantly, kindness, to every project."

Leslie Saul, Founder and Principal, Leslie Saul + Associates